Since 2010, many Solar Panel installations with high power capacity were installed.
Many times we were confronted with problems in the network and the existing capacitor banks.
These problems are :
(The regulators are replaced by BMR 6 and BMR 12 who measure in the 4 quadrants.)


When these problems occur in your company, don't hesitate to contact us. We have all the know how to offer you an optimal solution.